President University Repository

IMPROVING THE WORK SYSTEM BY REDUCING TIME IN SETUP ACTIVITY IN DRYING ROOM IN PHARMACEUTICAL INDUSTRY WITH SINGLE MINUTES EXCHANGE DIE (SMED) ANALYSIS AT PT. HJ

Files in this item

This item appears in the following Collection(s)

Search Repository


Advanced Search

Browse

My Account