President University Repository
Search
Login
Home
→
05. Undergraduate Theses
→
School of Engineering
→
Search
JavaScript is disabled for your browser. Some features of this site may not work without it.
Search
Filters
Use filters to refine the search results.
Current Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
New Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Showing 10 out of a total of 10 results for community: School of Engineering.
(0.012 seconds)
Now showing items 1-10 of 10
1
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
VALUE STREAM MAPPING IMPLEMENTATION AND IMPROVEMENT AT PT. HW
Anggita, Delvia
(
President University
,
2018
)
REDUCING SHIFTLY CLEANING PROCESSING TIME IN PACKAGING AREA AT CIGARETTE MANUFACTURING COMPANY, WEST JAVA
Partty, Jefferzon Leona
(
President University
,
2017
)
PENINGKATKAN KAPASITAS PRODUKSI CUTTING TOOLS BRAZING TIPPED DENGAN PENDEKATAN LEAN DI PT. SGI TOOLS MANUFACTURING
Wicaksono, Eko Darmawan
(
President University
,
2018
)
IMPLEMENTING LEAN MANUFACTURING IN HONDA AIR OUTLET PRODUCTION STUDY CASE IN PT.X
Arifin, Crissy Paramita Aisahana
(
President University
,
2016
)
LEAN MANUFACTURING IMPLEMENTATION TO REDUCE REJECTION RATE OF CRANKCASE
Charlies, Zerlynda Novia
(
President University
,
2014
)
IMPLEMENTING LEAN MANUFACTURING IN PLASTIC CHAIR INJECTION MOULDING PRODUCTION PROCESS USING VALUE STREAM MAPPING APPROACH
Vania, Eliza
(
President University
,
2019
)
INCREASING OUTPUT OF TRUCK 2528C AND 2528R PRODUCTION IN PT. XYZ
Chrisshyaren
(
President University
,
2019
)
INCREASING OF THE EFFECTIVENESS TIME AND AVOIDING THE CUMULATIVE TRAUMA DISORDER (CTD) RISK IN BUSHING ASSEMBLY LINE BY DESIGNING SUPPORTING TOOLS IN PT. SINTRA SINARINDO ELEKTRIK
Leonardo
(
President University
,
2020
)
TIME WASTE REDUCTION OF SW LINE IN ELECTRICAL PANEL MANUFACTURING
Kaban, Natanega Arihta
(
President University
,
2020
)
IMPLEMENTATION OF VALUE STREAM MAPPING TO REDUCE WASTE IN ARM COMP DECOMP K-40 PRODUCTION
Nugroho, Muhammad Naufal
(
President University
,
2022
)
Now showing items 1-10 of 10
1
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Browse
All of Repository
Communities & Collections
By Issue Date
Authors
Titles
Subjects
This Community
By Issue Date
Authors
Titles
Subjects
My Account
Login
Discover
Author
Anggita, Delvia (1)
Arifin, Crissy Paramita Aisahana (1)
Charlies, Zerlynda Novia (1)
Chrisshyaren (1)
Kaban, Natanega Arihta (1)
Leonardo (1)
Nugroho, Muhammad Naufal (1)
Partty, Jefferzon Leona (1)
Vania, Eliza (1)
Wicaksono, Eko Darmawan (1)
Subject
Lean Manufacturing (10)
Value Stream Mapping (3)
Economic Order Quantity (EOQ) (2)
Machine Breakdown (2)
Overall Equipment Effectiveness (OEE) (2)
Total Productive Maintenance (TPM) (2)
Vendor Managed Inventory (VMI) (2)
5S (1)
5s Principle (1)
Basic Motion (1)
... View More
Date Issued
2018 (2)
2019 (2)
2020 (2)
2014 (1)
2016 (1)
2017 (1)
2022 (1)
Has File(s)
Yes (10)