President University Repository
Search
Login
Home
→
05. Undergraduate Theses
→
School of Engineering
→
Industrial Engineering
→
2015
→
Search
JavaScript is disabled for your browser. Some features of this site may not work without it.
Search
Filters
Use filters to refine the search results.
Current Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
New Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Showing 10 out of a total of 51 results for collection: 2015.
(0.009 seconds)
Now showing items 1-10 of 51
1
2
3
4
. . .
6
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
REDUCING LEAKING PROBLEMS OF MOTORCYCLE RADIATORS USING DMAIC IN PT.X
Arya, Ruben
(
President University
,
2015
)
SUPPLIER SELECTION BY USING THE COMBINATION METHOD OF ANALYTICAL HIERARCHY PROCESS (AHP) AND TECHNIQUE FOR ORDER PREFERENCE BY SIMILARITY TO IDEAL SOLUTION (TOPSIS)
Nathalia
(
President University
,
2015
)
IMPROVEMENT OF REDUCING LEAD TIME IN FINAL ASSEMBLY AREA AT PT. XYZ
Yudistya, Reynaldo
(
President University
,
2015
)
IMPROVING THE SPARE PARTS MANAGEMENT AND INVENTORY CONTROL IN CASE OF LINE STOP REDUCTION IN ASSEMBLING SHOP IN PT.XYZ
Saputra, Teuku Mirwan
(
President University
,
2015
)
DECREASING DEMERIT VALUE IN TORSO ASSEMBLY PROCESS IN TOY’S MANUFATURING BY USING INTEGRATED FIRST ARTICLE INSPECTION PROCESS (A CASE STUDY IN PT.XYZ)
Johann, Ivan Orlando
(
President University
,
2015
)
DETERMINING SERVICE LEVEL BY FORECASTING DEMAND AND ANALYZING SAFETY STOCK FOR INTERMITTENT PARTS IN PT. ZZZ
Wibisono, Paulus Verdian
(
President University
,
2015
)
FLEXIBLE SCHEDULING IMPLEMENTATION TO REDUCE THE LATENESS FINISH TESTING ATQUALITY ASSURANCE LABORATORY OF PT X
Utari, Kurnia Wahyu
(
President University
,
2015
)
CONSTRUCTING RISK PROJECT MANAGEMENT TO PREVENT CONSEQUENCES OF FAILURE IN PRODUCTION OF NEW MODEL AT AN AUTOMOTIVE MANUFACTURER
Meglim, Crisselda
(
President University
,
2015
)
RE-LAYOUT COMPLETELY KNOCKED DOWN AND SERVICE PART LOGISTICS SYSTEM BY USING CRAFT
Aliyuslita
(
President University
,
2015
)
APPLICATION OF RESPONSE SURFACE METHODOLOGY OF EXPERIMENTAL DESIGNS ON WELDING OPERATION SETTINGS TO REDUCE THE DEFECTS OF MINIATURE CIRCUIT BREAKER RATING 2 AMPERE
Veronika
(
President University
,
2015
)
Now showing items 1-10 of 51
1
2
3
4
. . .
6
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Browse
All of Repository
Communities & Collections
By Issue Date
Authors
Titles
Subjects
This Collection
By Issue Date
Authors
Titles
Subjects
My Account
Login
Discover
Author
Adhiguna, Satria (1)
Adwito, Priyanda (1)
Aliyuslita (1)
Angela, Feberyca (1)
Anindya, Anggayasti Kusnandini (1)
Ansyah, Tesa Budi (1)
Arya, Ruben (1)
Assiddiqi, Luqyana (1)
Banurea, Frimadona (1)
Borman, Mohammad Riski (1)
... View More
Subject
Improvement (3)
Failure Mode and Effect Analysis (FMEA) (2)
Fishbone Diagram (2)
Marketing Mix (2)
Metode Transportasi (2)
output (2)
Peramalan (2)
Place (2)
Price (2)
Product (2)
... View More
Date Issued
2015 (50)
2014 (1)
Has File(s)
Yes (51)