| dc.contributor.author | Novando, (004201100035) | |
| dc.date.accessioned | 2022-08-11T09:36:34Z | |
| dc.date.available | 2022-08-11T09:36:34Z | |
| dc.date.issued | 2014 | |
| dc.identifier.uri | http://repository.president.ac.id/xmlui/handle/123456789/9006 | |
| dc.language.iso | en_US | en_US |
| dc.publisher | President University | en_US |
| dc.relation.ispartofseries | Industrial Engineering;004201100035 | |
| dc.title | Increasing Utilization of Material Handling Device in CV and PC Unpacking Area By Using Time Study and Simulation at PT. Mercedes-Benz Indonesia | en_US |
| dc.type | Other | en_US |