President University Repository

REDUCING CYCLE TIME OF MAKING INNER CONTACT RUBBER AT AFTER PROCESS DEPARTMENT IN PT.XYZ

Show simple item record

dc.contributor.author Mahatma, Angga
dc.date.accessioned 2019-07-25T05:14:55Z
dc.date.available 2019-07-25T05:14:55Z
dc.date.issued 2016
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/1002
dc.description.abstract Delay delivery is a crucial problem because it is related with customer’s trust. Delay delivery itself occur because several factors, one of the factors is the cycle time less than the takt time that cause the output produced cannot meet the customer demand and make the delay delivery happen. In PT.XYZ, in order to make the products, there are several processes in production floor that should be passed such as molding, oven and after process. In current condition, after process is a process with the highest cycle time in this process is 17.5 seconds per pieces with the total output produced is 823 pieces per hour using 4 lines at after process. There are four steps in this after process which are punching, cleaning pill, resistance check and guarantee inspection and packing. In this case, the cycle time can be reduced by maintaining the operator task to be more effective and efficient. The flow process chart will clearly show that there is effective and ineffective time. Here, the line efficiency will show the balancing for every process area, where the cycle time between oven and after process is not balance and causes a long idle time. As the result, the cycle time is successfully increasing the total output from 823 pieces per hour to be 3,388 pieces per hour. en_US
dc.language.iso id en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201100037
dc.subject Delay delivery en_US
dc.subject Cycle time en_US
dc.subject Effective and Efficiency en_US
dc.subject Flow Process Chart en_US
dc.subject Line Efficiency en_US
dc.subject Fish Diagram en_US
dc.subject Standard Operation Chart (SOC) en_US
dc.title REDUCING CYCLE TIME OF MAKING INNER CONTACT RUBBER AT AFTER PROCESS DEPARTMENT IN PT.XYZ en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account