President University Repository

RE-LAYOUT COMPLETELY KNOCKED DOWN AND SERVICE PART LOGISTICS SYSTEM BY USING CRAFT

Show simple item record

dc.contributor.author Aliyuslita
dc.date.accessioned 2019-07-25T06:31:56Z
dc.date.available 2019-07-25T06:31:56Z
dc.date.issued 2015
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/1022
dc.description.abstract Production Layout is an important aspect which influences material handling cost. Different product mix in PT. ABC, requiring one of the product to be produced in separate area (building). In this expansion, designing efficient production layout for Completely Knocked Down (CKD) and Service Part is very important. There are several tools to support the process of designing layout, such as; Storage Analysis Chart, Activity Relationship Chart, Activity Relationship Diagram, and Heuristic Method of CRAFT. The result of designing layout by using CRAFT calculation, it has Material Handling Cost Rp 4,892,138.5. However, the layout design still can be improved by using ARC before CRAFT process, resulting Material Handling Cost reduced by Rp 55085.5. This proposed layout (alternative 2) showing the better flow of material through the process. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201100016
dc.subject Material Handling Cost en_US
dc.subject Layout Design en_US
dc.subject CRAFT en_US
dc.subject Storage Analysis Chart en_US
dc.subject Activities Relation Chart en_US
dc.subject Activities Relation Diagram en_US
dc.subject Production Layout en_US
dc.title RE-LAYOUT COMPLETELY KNOCKED DOWN AND SERVICE PART LOGISTICS SYSTEM BY USING CRAFT en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account