President University Repository

INCREASING EFFICIENCY OF LINE M123 THROUGH THE APPLICATION OF TIME STUDY AND LINE BALANCING METHOD (CASE STUDY AT PT XY)

Show simple item record

dc.contributor.author Arif, Muhammad
dc.date.accessioned 2019-07-26T10:21:40Z
dc.date.available 2019-07-26T10:21:40Z
dc.date.issued 2016
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/1101
dc.description.abstract The focus of this research is to increase the line efficiency of line M123. The root causes of having low efficiency itself are less accuracy and poor work arrangement. Because of that, the output is not match the target and overtime must be done. To overcome the problem, the root cause must be attacked by firstly doing the time study prior the other method to be done. An accurate standard time is expected to make the number of operator adequate and designing the work arrangement smoothly without violating the takt time. To deal with a proper work arrangement, line balancing method is used. The result shows that the efficiency can be increased by 32.89% from previously 57.11% to 90%. The target output can also be achieved together with the reduction number of operator. Thus, the cost can be minimized. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201200023
dc.subject line efficiency en_US
dc.subject time study en_US
dc.subject standard time en_US
dc.subject line balancing en_US
dc.subject work arrangement en_US
dc.subject cycle time en_US
dc.subject takt time en_US
dc.title INCREASING EFFICIENCY OF LINE M123 THROUGH THE APPLICATION OF TIME STUDY AND LINE BALANCING METHOD (CASE STUDY AT PT XY) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account