President University Repository

VENDOR MANAGED INVENTORY IN THE JOINT REPLENISHMENT OF MULTI - PRODUCTS SINGLE - SUPPLIER

Show simple item record

dc.contributor.author Aushafina, Atrisya
dc.date.accessioned 2021-08-10T05:53:16Z
dc.date.available 2021-08-10T05:53:16Z
dc.date.issued 2020
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/3620
dc.description.abstract PT. ZBC Indonesia is a company engaged in the industrial sector, namely producing electrical panels. In carrying out its production activities it is closely related to the supply of raw materials that must be available for the smooth production process. This study aims to determine the control of electrical material inventory of PT. ZBC Unfortunately, the implementation of Economic Order Quantity still have flaw and resulting high inventory cost and inefficient order generation. The current system will be compared with the Joint Replenishment method based on ABC Analysis. PT. ZBC will forecast the demand and sent to vendor in Vendor Managed Inventory system. The result shows that by implementing Joint Replenishment and Vendor Managed Inventory can save both work efficiency and cost incurred of IDR 45.255.588,76 or 2.31% in percentage. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201600038
dc.subject Inventory Management en_US
dc.subject Vendor Managed Inventory en_US
dc.subject Joint Replenishment Cost Minimization en_US
dc.subject ABC Analysis en_US
dc.subject XYZ Analysis en_US
dc.subject Forecasting en_US
dc.subject Safety Stock en_US
dc.subject Reorder Point en_US
dc.subject Inventory Cost en_US
dc.subject Economic Order Quantity en_US
dc.title VENDOR MANAGED INVENTORY IN THE JOINT REPLENISHMENT OF MULTI - PRODUCTS SINGLE - SUPPLIER en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account