President University Repository

VALUE STREAM MAPPING IMPLEMENTATION AND IMPROVEMENT AT PT. HW

Show simple item record

dc.contributor.author Anggita, Delvia
dc.date.accessioned 2019-04-25T10:14:57Z
dc.date.available 2019-04-25T10:14:57Z
dc.date.issued 2018
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/430
dc.description.abstract In facing the free market era, PT.XI is required to increase their competitiveness to produce products in effective and efficient way. As a toy manufacturing company, PT.XI tend to produce good quality of product. It can be achieved by optimize the production process. In order to achieve production process optimization, observation is done to analyze non-value added occur in company. Implementation of lean approach is use to determine unnecessary activity by conduct value stream mapping. From current stream mapping, Die Cast area contributes high number of non-value added. As the initial stage in production process of car, die cast plays an important role, since many part produced in this stage. The objectives of this research are to analyze possibility improvement in production process, to eliminate non-value added activity, and to proposed improvements in toy production system. To overcome with inventory management system, method being proposed is Economic Order Quantity (EOQ) and Vendor Managed Inventory (VMI). Whereas, according to machine reliability problem, the proposed method is Total Productive Maintenance (TPM) to increase OEE performance. As the final result, some improvements in die cast area are occur, such as inventory stacking from 19 days to 5 days, OEE performance increase from 88% to 73%. Thus, proposed improvement is considered as efficient. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201400016
dc.subject Lean Manufacturing en_US
dc.subject Economic Order Quantity (EOQ) en_US
dc.subject Vendor Managed Inventory (VMI) en_US
dc.subject Total Productive Maintenance (TPM) en_US
dc.subject Overall Equipment Effectiveness (OEE) en_US
dc.subject Machine Reliability en_US
dc.subject Machine Breakdown en_US
dc.title VALUE STREAM MAPPING IMPLEMENTATION AND IMPROVEMENT AT PT. HW en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account