| dc.contributor.author | Wendy, (004201405082) | |
| dc.contributor.author | Wendy, (004201405082) | |
| dc.date.accessioned | 2022-08-11T03:23:53Z | |
| dc.date.available | 2022-08-11T03:23:53Z | |
| dc.date.issued | 2017 | |
| dc.date.issued | 2017 | |
| dc.identifier.uri | http://repository.president.ac.id/xmlui/handle/123456789/8928 | |
| dc.language.iso | en_US | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | President University | en_US |
| dc.publisher | President University | en_US |
| dc.relation.ispartofseries | Industrial Engineering;004201405082 | |
| dc.relation.ispartofseries | Industrial Engineering;004201405082 | |
| dc.title | PENERAPAN LEAN SIX SIGMA DALAM PENURUNAN BIAYA DEFECT PART CLAMP ACG CORD DI PT SULTAN METAL FORMING INDONESIA (Study Kasus PT. Sultan Metal Forming Indonesia | en_US |
| dc.title | PENERAPAN LEAN SIX SIGMA DALAM PENURUNAN BIAYA DEFECT PART CLAMP ACG CORD DI PT SULTAN METAL FORMING INDONESIA (Study Kasus PT. Sultan Metal Forming Indonesia | en_US |
| dc.type | Other | en_US |
| dc.type | Unpublished Student Paper | en_US |