President University Repository

ENHANCING OPERATIONAL AT JAVA 7 POWER PLANT THROUGH STANDARDIZED MANAGEMENT SYSTEM FOR CAPITAL CONSTRUCTION MATERIALS AND EQUIPMENT

Show simple item record

dc.contributor.author Ran, Gao
dc.date.accessioned 2024-12-04T07:48:16Z
dc.date.available 2024-12-04T07:48:16Z
dc.date.issued 2023
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/12369
dc.description.abstract The Java 7 power plant equipment standardization management system is mainly composed of three parts: standardization organization, standardization management work procedures, and job responsibilities. Through the construction of the organizational structure, each employee can clearly define the structure of the overall enterprise management and the work nodes where they are located, providing a clear work direction and responsible departments to be implemented for the implementation of each work; through the establishment of standardized management procedures, the employees can clarify the implementation process of each job, and the relevant operation methods and rules are familiar; through the construction of job responsibilities, each employee can clearly define the job responsibilities, rights and obligations of each post, and the specific job responsibilities strengthen the implementation of management work. Through the implementation of the equipment standardization management system, the equipment required for the company's construction, production and operation activities has been effectively controlled throughout the process, ensuring that the quality of the purchased equipment meets the specified requirements and the price is reasonable, and the company's best economic benefits have been achieved. The standardized equipment management system is a powerful guarantee for the whole process management of infrastructure materials and equipment. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Master of Technology Management;023202205007
dc.title ENHANCING OPERATIONAL AT JAVA 7 POWER PLANT THROUGH STANDARDIZED MANAGEMENT SYSTEM FOR CAPITAL CONSTRUCTION MATERIALS AND EQUIPMENT en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account