President University Repository

MANPOWER PLANNING OF ASSEMBLY LINE PART A005TG2991ZJ AT PT. MITSUBISHI ELECTRIC AUTOMOTIVE INDONESIA, JAWA BARAT

Show simple item record

dc.contributor.author Ramadina, Chyntia
dc.contributor.author Ineu Widaningsih Sosodoro
dc.date.accessioned 2021-08-04T06:35:33Z
dc.date.available 2021-08-04T06:35:33Z
dc.date.issued 2016
dc.identifier.issn 2503-3670
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/3535
dc.description JOURNAL OF INDUSTRIAL ENGINEERING; VOL 1, NO.1 (2016). en_US
dc.description.abstract Uncertainty presents on cars market demands affect in arranging the production plan of each automotive industry. Achieve the exact number of actual demand is nearly impossible since the demand itself is uncertain. As the demand increase, additional operators are needed to increase the output and vice versa. Manpower planning is useful in controlling such problems. The output and number of operators needed can be estimated hence, fulfilling demand then become easier. PT. Mitsubishi Electric Automotive Indonesia shortened as MEAINA is an automotive company has an issue regarded its manpower planning. Manpower plan for alternator assembly line producing model A005TG2991ZJ currently has been limited. Besides, the estimation of manpower plan is pretty rough. In overcoming this problem, yamazumi chart and precedence diagram are used to support the arrangement of workstations which directly affect to the manpower plan. By using the two method, improvement in output and line balancing percentage is expected to be obtained. The results confirmed that there is an improvement in the number of output, while line balancing percentage is slightly decline, nevertheless a significant improvement in both monthly output and line efficiency is detected on manpower plan of 20 operators. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.subject Market Demand en_US
dc.subject Manpower Planning en_US
dc.subject Assembly Line en_US
dc.title MANPOWER PLANNING OF ASSEMBLY LINE PART A005TG2991ZJ AT PT. MITSUBISHI ELECTRIC AUTOMOTIVE INDONESIA, JAWA BARAT en_US
dc.type Journal Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account