President University Repository

Browsing 2019 by Subject "Operating Time"

Browsing 2019 by Subject "Operating Time"

Sort by: Order: Results:

  • Kaban, Natanega Arihta (President University, 2020)
    Warehouse is one of the main feature that will be used to save the raw material required in production process. Material management issue will be the topic to improve SW Line operating time to increase productivity. Yamazumi ...

Search Repository


Advanced Search

Browse

My Account