President University Repository

INCREASING EFFICIENCY OF LINE M123 THROUGH THE APPLICATION OF TIME STUDY AND LINE BALANCING METHOD (CASE STUDY AT PT XY)

Files in this item

This item appears in the following Collection(s)

Search Repository


Advanced Search

Browse

My Account