President University Repository

IMPLEMENTATION OF DMAIC METHODS TO REDUCE SCRAP IN PLASTIC INJECTION MOLDING AREA AT PT.ABC INDONESIA

Show simple item record

dc.contributor.author Randhika, Denartha
dc.date.accessioned 2024-11-18T09:01:10Z
dc.date.available 2024-11-18T09:01:10Z
dc.date.issued 2023
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/12123
dc.description.abstract PT.ABC Indonesia has a project to reduce high number of scraps in Primary Production area. Plastic Injection Molding area contributes over 50% from total scrap in Primary Production area and resulted scrap value that total Rp. 378.803.000 in first quarter of 2023. These scraps happen because of the changeover process procedure. This research use Lean Six Sigma approach through DMAIC Methodology. Several improvements are implemented new procedure for color change and tool change without purging process and slide the hopper when Daily Schedule Adherence achieve 95%. The improvement resulted 57% reduction of scrap in Plastic Injection Molding. In detail, color change and tool change procedure reduce 62% scrap, While the slide hopper process was reduce wrong color scrap by 16%. By this research, the company already saving the cost Rp. 49.237.000 and predicted will save up to Rp. 434.660.000 by the end of year 2023. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201900057
dc.subject DMAIC en_US
dc.subject Lean en_US
dc.subject Six Sigma en_US
dc.subject Plastic Injection Molding en_US
dc.subject Purging en_US
dc.subject Scrap en_US
dc.subject Wrong Color en_US
dc.title IMPLEMENTATION OF DMAIC METHODS TO REDUCE SCRAP IN PLASTIC INJECTION MOLDING AREA AT PT.ABC INDONESIA en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account