DESIGNING A WEB BASED INFORMATION SYSTEM FOR THE DISPOSITION OF MATERIAL CHANGES AT PT SFP USING WATERFALL SYSTEM DEVELOPMENT LIFE CYCLE (SDLC) METHOD

Show simple item record

dc.contributor.author Tobing, Sophia Margareth
dc.date.accessioned 2024-11-18T09:10:57Z
dc.date.available 2024-11-18T09:10:57Z
dc.date.issued 2023
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/12126
dc.description.abstract PT SFP is a manufacturing company that produces flexible plastic packaging. The activity of making material change dispositions is one of the important things in the production process. This is done when the starting material for a product that has been determined changes whether it is a change in the type of material, size, or thickness with the reasons and objectives of each. So that the standard product material that has been set will change. The disposition of material changes has been done manually using Microsoft Excel by the Material Planner and this manual process has a high cycle time of 4 hours 17.9 minutes if the production process is carried out at the Jababeka Plant and 3 hours 41.1 minutes if the production process is carried out at Ancol or the Cibitung Plant. Based on observations, it takes hours to make the disposition of the material change. Meanwhile, under the same conditions, the Material Planner also has to do other tasks. Material Planner is very overwhelmed to make material change dispositions manually and this can result in human errors in inputting data one by one, consuming more time and effort. Because it has been repeated for a long time, the system will be improved by approaching the system engineering design using the System Development Life Cycle (SDLC), namely the waterfall methodology. The proposed system is a web-based system as the main tool to reduce processing time in making material change dispositions. The proposed system is proven to make the film material change disposition process more effective and efficient. After the improvement, the time consumption of current system is 4 hours 17.9 minutes if the production process at Jababeka Plant and 3 hours 41.1 minutes if the production process at Ancol or Cibitung Plant becomes 25.5 minutes using the proposed system. That is, this improvement helps the user to complete the material change disposition creation job faster than ever before compared to the current system. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201900062
dc.subject Disposition en_US
dc.subject Material Change en_US
dc.subject Time Consumption en_US
dc.subject Microsoft Excel en_US
dc.subject Web- System en_US
dc.subject Waterfall System Development Life Cycle (SDLC) en_US
dc.title DESIGNING A WEB BASED INFORMATION SYSTEM FOR THE DISPOSITION OF MATERIAL CHANGES AT PT SFP USING WATERFALL SYSTEM DEVELOPMENT LIFE CYCLE (SDLC) METHOD en_US
dc.type Thesis en_US