President University Repository

ANALYSIS OF REDUCING WASTE AT LINE PRODUCTION OF AUTO ROOTING AREA AT TIY MANUFACTURING USING 5S METHOD

Show simple item record

dc.contributor.author Hesita, Angelia Gadis
dc.date.accessioned 2025-05-23T07:19:00Z
dc.date.available 2025-05-23T07:19:00Z
dc.date.issued 2024
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/12805
dc.description.abstract PT MI toy manufacturing has a production place specifically for sewing doll hair called FAR (Full Auto Rooting). The FAR production area having a total of 319 sewing machines operating. The core issue in PT MI's FAR production area is the inadequate handling of generated waste, leading to potential work accidents. Analysis of waste data from May to July 2022 reveals significant quantities of yarn waste, reject sculpt, reject onyx, and feeddog scrap. This accumulation not only compromises workplace cleanliness but also contributes to safety hazards. To address these challenges, a 5S Checklist audit was conducted, resulting in a score of 53 out of 100, highlighting areas needing improvement. The proposed solution involves implementing Standard Operating Procedures (SOPs) aligned with 5S principles (Sort, Set in Order, Shine, Standardize, Sustain). These SOPs aim to enhance waste reduction practices, establish organizational standards, and promote a safer and more efficient working environment in the FAR production area. By integrating systematic sorting, organizing, cleaning, standardizing, and sustaining practices, PT MI seeks to mitigate waste-related risks and foster a culture of continuous improvement and safety awareness among its workforce. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201700044
dc.subject 5S en_US
dc.subject Five-Whys Analysis en_US
dc.subject Safety en_US
dc.subject Standard Operating Procedure en_US
dc.subject Waste en_US
dc.subject Work Accidents en_US
dc.title ANALYSIS OF REDUCING WASTE AT LINE PRODUCTION OF AUTO ROOTING AREA AT TIY MANUFACTURING USING 5S METHOD en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account