dc.contributor.author |
Vania, Eliza |
|
dc.date.accessioned |
2020-05-24T23:32:21Z |
|
dc.date.available |
2020-05-24T23:32:21Z |
|
dc.date.issued |
2019 |
|
dc.identifier.uri |
http://repository.president.ac.id/xmlui/handle/123456789/2747 |
|
dc.description.abstract |
This research integrates Value Stream Mapping with considering the reduction of its Non Value Added time. A Value Stream Mapping provides a blueprint for implementing lean manufacturing concept by showing information and flow of materials. The total Non-Value Added time of current Value Stream Mapping is 3 days and mostly caused by transportation activity from cooling to packaging area. The objective of the research is reducing the NonValue Added time and wastes in PT. X from current Value Stream Mapping, then redesigning future Value Stream Mapping with result of improvements. After implementing the improvements and redesigning future Value Stream Mapping, the result of Non-Value Added time reduced the lead-time from 3 days to 2 days, and the total cost were reduce to. |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
President University |
en_US |
dc.relation.ispartofseries |
Industrial Engineering;004201400020 |
|
dc.subject |
Lean Manufacturing |
en_US |
dc.subject |
Value Stream Mapping |
en_US |
dc.subject |
Kaizen |
en_US |
dc.subject |
Process Activity Mapping |
en_US |
dc.title |
IMPLEMENTING LEAN MANUFACTURING IN PLASTIC CHAIR INJECTION MOULDING PRODUCTION PROCESS USING VALUE STREAM MAPPING APPROACH |
en_US |
dc.type |
Thesis |
en_US |