President University Repository

TIME WASTE REDUCTION OF SW LINE IN ELECTRICAL PANEL MANUFACTURING

Show simple item record

dc.contributor.author Kaban, Natanega Arihta
dc.date.accessioned 2021-08-02T09:26:44Z
dc.date.available 2021-08-02T09:26:44Z
dc.date.issued 2020
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/3503
dc.description.abstract Warehouse is one of the main feature that will be used to save the raw material required in production process. Material management issue will be the topic to improve SW Line operating time to increase productivity. Yamazumi chart is used to define the time spent for value added, necessary and non-added value time to decide which workstation to be improved and causes bottlenecking. It is found that SW-03 workstation is the most inefficient with 18.7 minutes operating time and 19.5% (3.64 minutes) of its time is non-added value time. The non-added value time caused by idling while waiting material which is triggered to be out of stock. The material issue will be solved by implementing Kanban for the materials involved in SW-03. The result after eliminating the bottleneck is improving the operating time for SW-03 by 10.16% to 16.8 minutes with non-added value time of 10.35% (1.74 minutes). en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201500022
dc.subject Lean Manufacturing en_US
dc.subject Yamazumi Chart en_US
dc.subject Root Cause Analysis en_US
dc.subject Why’s Analysis en_US
dc.subject Kanban en_US
dc.subject Operating Time en_US
dc.subject SAP en_US
dc.title TIME WASTE REDUCTION OF SW LINE IN ELECTRICAL PANEL MANUFACTURING en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account