President University Repository

INCREASING THE CAPACITY PACKOUT PROCESS AT TOY MANUFACTURING

Show simple item record

dc.contributor.author Almaida, Triyulianti
dc.date.accessioned 2022-08-15T05:00:54Z
dc.date.available 2022-08-15T05:00:54Z
dc.date.issued 2021
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/9211
dc.description.abstract In manufacturing companies, the company's ability to face every challenge is very important to remain competitive in the business world. Toy Manufacturing is one of the largest manufacturing companies in Indonesia, located in West Java. Toy Manufacturing has a new product called FP toy produced from October 2020 to March 2021. The forecast orders for FP toy that will be produced by the company is increasing every month. The problem that occurs in this company is that an increase in demand must be covered while the actual production of FP output is lower than demand. To solve this problem the author designed the jig and workstation. The purpose of jig and workstation design is to reduce cycle time in the production process packout of FP to increase the capacity. The method used to determine jig and workstation design is Quality Function Deployment (QFD) to translate operator needs and provide solutions according to the capacity that can be met. The data collection was carried out through Focus Group Discussion (FGD), interviews, and direct observation. Some of the tools used in this study include the House of Quality (HOQ), screening, and scoring. The results of this study are in the form of jigs and workstations that can increase the efficiency of the FP production process packout from 80% to 94%, increasing the output from 1600 toys to 1880 toys in 8-hours production. Besides, jigs and workstations make it easier for operators to work in packout process production FP. en_US
dc.language.iso en_US en_US
dc.publisher PRESIDENT UNIVERSITY en_US
dc.relation.ispartofseries Industrial Engineering;004201700022
dc.subject Quality Function Deployment (QFD) en_US
dc.subject House of Quality (HOQ) en_US
dc.subject Jig en_US
dc.subject Workstation en_US
dc.title INCREASING THE CAPACITY PACKOUT PROCESS AT TOY MANUFACTURING en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account