JOB SHOP SCHEDULING IN DIE CUT AREA USING NON DELAY SCHEDULING METHOD TO MINIMIZE THE TOTAL MAKESPAN AND TARDINESS IN TOYS MANUFACTURING COMPANY, WEST JAVA

Show simple item record

dc.contributor.author Wangsa, Tania Agneta
dc.date.accessioned 2020-09-29T03:43:06Z
dc.date.available 2020-09-29T03:43:06Z
dc.date.issued 2018
dc.identifier.uri http://repository.president.ac.id/xmlui/handle/123456789/2835
dc.description.abstract As one of the world’s biggest toy manufacturing company, PT. XYZ has several production processes which divided into several production area. Die Cut area is one of several production areas in PT. XYZ which handles the process of cutting fabric into smaller pieces. Currently, scheduling model in Die Cut area which uses earliest due date as the dispatching rule has not optimum yet, since there is still a late delivery which causes PT. XYZ has to pay additional cost as penalty cost given by vendor for exceeding due date. The total makespan to complete the whole 16 jobs took 71.002 hours and total cost that has to be spent is 881,680,000 IDR. The objective of this research is to find the optimum scheduling model which can reduce cost by minimizing total makespan and tardiness. In this research, availability of machines will be considered so the scheduling model will be more realistic and applicable to the real condition in Die Cut area at PT. XYZ. The total makespan obtained from proposed model which is non delay scheduling with working time window is 43.167 hours which means decreasing up to 39% while the cost is decreasing from 881,680,000 IDR to 561,180,000 IDR. en_US
dc.language.iso en_US en_US
dc.publisher President University en_US
dc.relation.ispartofseries Industrial Engineering;004201400047
dc.subject Job Shop Scheduling en_US
dc.subject Non Delay Scheduling en_US
dc.subject Earliest Due Date en_US
dc.subject Non Delay Scheduling with Working Time Window en_US
dc.subject Makespan en_US
dc.subject Tardiness en_US
dc.title JOB SHOP SCHEDULING IN DIE CUT AREA USING NON DELAY SCHEDULING METHOD TO MINIMIZE THE TOTAL MAKESPAN AND TARDINESS IN TOYS MANUFACTURING COMPANY, WEST JAVA en_US
dc.type Thesis en_US